The Village met with the Metropolitan Water Reclamation District of Greater Chicago (MWRD) in December to discuss ongoing flood mitigation initiatives and plan for future projects. The MWRD indicated that they remain committed to assisting the Village with these efforts. The Village intends to submit for a permit related to the 50th Street project, located in the South Basin, this month.
Overall, flood mitigation is a continued effort that encompasses a spectrum of short- and long-term initiatives including major stormwater system construction projects, annual construction to repair and improve the sewer system, maintenance activities such as slip-lining, cleaning, televising, catch basin clearing, street sweeping, and the conduct of engineering studies that serve to identify where targeted investments will have the greatest impact on mitigating floods, as well as policies and regulations aimed at reducing flooding over time.